
Dican Electric · Sacramento area
Home EV charger installation
We install Level 2 home chargers in Sacramento and nearby communities.
- Level 2 installationCustomer supplies the charger
- From $600
Final pricing confirmed in a free written estimate. What’s included & extras ↓
(916) 573-0876Weekdays, 7am–6pm
CA C-10 licensed · Bonded & insured · Family-owned
Customer-supplied charger. Base price assumes suitable panel capacity and wiring access.

Real projects. Local homeowners.
A closer look at our work.


“The quality of work was excellent and left the work space very clean.”
“Shows up on time, does excellent work and has fair pricing.”
Know what you’re paying for
What’s included. What can cost extra.
Customer-supplied charger. Base price assumes suitable panel capacity and wiring access. Your written estimate confirms the equipment, work, and total before you decide.
Included in the agreed scope
- Review of your panel, charger, and planned location
- The agreed charging circuit and wiring
- Charger mounting, connection, startup, and testing
Equipment and installation details
Level 2 charging uses a dedicated higher-voltage home circuit. We review the charger's requirements, the home's electrical capacity, circuit size, breaker, wiring route, and mounting location. A hardwired charger or receptacle is identified in the estimate. The base installation price does not include the charger.
Level 2 charger installation
Installation of a customer-supplied Level 2 charger where the electrical path and panel are ready for the planned circuit.
- Panel-capacity and charger review
- Circuit, wiring, and protection as scoped
- Charger mounting, connection, startup, and testing
Work that may add to the price
- A longer wiring route or difficult access
- Panel changes or additional electrical capacity
- Outdoor conduit, trenching, or finish work
- Electrical work beyond the agreed charging circuit
We review access, equipment, and any permit requirements for your home. The written estimate explains what is included and any additional costs.
From your first call to the final check
Three straightforward steps.
- 01
Tell us what you need
Not sure your panel is ready? We check it before recommending the work. Let us know where the home is and what you want to change.
- 02
Review your written estimate
We review the setup and access, then explain the equipment, work, and total. There’s no obligation to book.
- 03
Schedule the installation
After you approve, we arrange the work, install the agreed equipment, and check its operation.
Before you call
A few helpful answers.
Is the charger included?
No. The base installation price is for a customer-supplied charger. Your estimate identifies the charger and any additional electrical work.
Do I need a panel upgrade?
Not always. We review available capacity, the charger, and your home's existing electrical needs before recommending changes.
Do you install Tesla and other chargers?
Yes. Tell us the model if you have chosen one. We review the equipment and installation requirements before confirming the work.
Can the charger go outside?
Yes, when the charger and installation method are rated for the location and the wiring route is practical.
What about permits?
We identify any required permits and inspections in your written estimate and coordinate them as part of the agreed work.
Which areas do you serve?
We serve Sacramento and nearby communities, including Citrus Heights, Roseville, Folsom, Fair Oaks, Carmichael, Orangevale, Rocklin, and Granite Bay. Call to confirm your address.
A good place to start
Request a callback.
Leave your number. We’ll call to discuss your EV charger installation and arrange the next step toward a free written estimate.
Contact hours
Weekdays, 7am–6pm